Sr. No. Particulars Unit Details
1 Length Km 30.128 15.546
2 Row
Existing ROW (M)
Km. 0/000 to 18/648 Mt 15
Km. 18/648 to 30/128 Mt 12
Km. 0/000 to 26/460 Mt 14
Proposed ROW (M)
Km. 0/000 to 18/648 Mt 15
Km. 18/648 to 30/128 Mt 12
Km. 0/000 to 26/460 Mt 14
3.1 Pavement Type Section-A Intermediate Lane (Km) Two Lane with Paved Shoulder (Km)
Reconstruction 3.500
Widening 23.300
Overlay Section
Rigid Pavement 3.328
Total Length (KM) 30.128
3.2 Pavement Type Section-A Intermediate Lane (Km) Two Lane (Km)
Reconstruction
Widening 14.346
Overlay Section
Rigid Pavement 1.200
Total Length (KM) 15.546
5 Major Bridges
5.1 New Construction / Re-Construction NOS 1 0
Minor Bridges
5.1 New Construction / Re-Construction NOS 3 4
6 Slab Culvert
6.1 New Construction / Re-Construction 2 1
6.2 Widening 0 0
8 Pipe culverts
8.1 New Construction/ Reconstruction 41 35
8.3 Widening 34 16
8.4 Retained 0 0
9 Junctions Improvement
9.1 Major junctions 3 3
9.2 Minor Junction 17 8
10 Bus Shelter NOS 4 6
11 Covered RCC drain Rmt 6656 2400
12 Retaining wall Rmt 2200 300