demo
Sr. No. | Particulars | Unit | Details | |||
1 | Length | Km | 80.35 Km | |||
2 | Row | Existing ROW (M) | Proposed ROW (M) | |||
47600 | 75958 | 10 | 10 | |||
75958 | 130128 | 12 | 12 | |||
3 | Pavement Type | Intermediate Lane (Km) | Two Lane (Km) | |||
Reconstruction | 11.400 | 1.500 | ||||
Widening | 23.200 | 37.865 | ||||
Overlay Section | 1.800 | 2.965 | ||||
Rigid Pavement | 1.620 | |||||
Total Length (KM) | 80.350 | |||||
4 | Major Bridges | |||||
4.1 | Reconstruction | 1 | Nos | |||
4.2 | Widening /Repair | 1 | Nos | |||
5 | Minor Bridges | |||||
5.1 | New Construction / Re-Construction | 12 | Nos | |||
5.2 | Widening /Repair | 0 | Nos | |||
6 | Slab Culvert | |||||
6.1 | New Construction / Re-Construction | 9 | Nos | |||
8 | Pipe culverts | |||||
8.1 | New Construction/ Reconstruction | 178 | Nos | |||
8.3 | Widening | 62 | Nos | |||
8.4 | Retained | Nos | ||||
9 | Junctions Improvement | |||||
9.1 | Major junctions | 16 | Nos | |||
9.2 | Minor Junction | 25 | Nos | |||
10 | Bus Shelter | 13 | Nos | |||
11 | Covered RCC drain | 3120 | Rmt | |||
12 | Retaining wall | 2820 | Rmt |