Sr. No. |
Particulars |
Unit |
Details |
|
|
|
Section-A
|
Section-B
|
1 |
Length
|
Km
|
35.4
|
23.6
|
2 |
Row
|
|
|
|
Existing ROW (M)
|
|
12
|
8
|
|
Proposed ROW (M)
|
|
12
|
8
|
3.1 |
Pavement Type Section-A
|
|
Intermediate Lane (Km)
|
Two Lane with Paved Shoulder (Km)
|
|
Reconstruction
|
|
|
2.000
|
|
Widening
|
|
|
24.300
|
|
Overlay Section
|
|
7.100
|
|
|
Rigid Pavement
|
|
0.500
|
1.500
|
Total Length (KM)
|
35.400
|
3.2 |
Pavement Type Section-B
|
|
Intermediate Lane (Km)
|
Two Lane (Km)
|
|
Reconstruction
|
|
2.000 |
|
|
Widening
|
|
12.634 |
|
|
Overlay Section
|
|
7.566 |
|
|
Rigid Pavement
|
|
1.400 |
|
Total Length (KM)
|
23.600
|
5 |
Minor Bridges
|
|
|
|
5.1 |
New Construction / Re-Construction
|
NOS
|
1
|
3
|
6 |
Slab Culvert
|
|
|
|
6.1 |
New Construction / Re-Construction
|
|
11
|
6
|
6.2 |
Widening
|
|
1
|
0
|
8 |
Pipe culverts
|
|
|
|
8.1 |
New Construction/ Reconstruction
|
|
42
|
101
|
8.3 |
Widening
|
|
71
|
0
|
8.4 |
Retained
|
|
51
|
21
|
9 |
Junctions Improvement
|
|
|
|
9.1 |
Major junctions
|
|
7
|
3
|
9.2 |
Minor Junction
|
|
21
|
13
|
10 |
Bus Shelter
|
NOS
|
23
|
22
|
11 |
Covered RCC drain
|
Rmt
|
4975
|
2800
|
12 |
Retaining wall
|
Rmt
|
1360
|
650
|